What is the maximum number of days of employment a rural poor would get under 'MGNREGA'?
-
180 days
-
120 days
-
100 days
-
90 days
C.
100 days
Sponsor Area
What is the maximum number of days of employment a rural poor would get under 'MGNREGA'?
180 days
120 days
100 days
90 days
C.
100 days
Sponsor Area
Scheduled bank is a bank which is
nationalised
not Nationalised
based in foreign currency
included in the second schedule of RBI
D.
included in the second schedule of RBI
Black soil is also known by which of the following name?
Khadar Soil
Bangar Soil
Alluvial Soil
Regur Soil
D.
Regur Soil
What is the name of the book written by Panini?
Mahabhashya
Mitakshara
Madhyamika Karika
Ashtadhyayi
D.
Ashtadhyayi
Which dynasty was started by Khizr Khan?
The Sayyads
The Lodhis
The Rajputs
The Khiljis
A.
The Sayyads
Sponsor Area
Mock Test Series